TEKSAN, reliable partner of Health Sector in uninterrupted power solutions.
PROJECT NAME
Tuzla State Hospital / Turkey
PROJECT REQUIREMENTS
The trigeneration system with optimal efficiency that will meet the electric energy, heating and cooling need required for the critical operations of 400-bed Tuzla State Hospital to continue without interruption.
SOLUTION WE DELIVERED
As a result of the analysis and feasibility studies performed, 2x400 kWe trigeneration system solution that would provide the optimal efficiency for this project has been developed, and the energy costs of the hospital operation have been saved considerably by this solution developed.