TEKSAN, Preference of shopping malls in trigeneration...
PROJECT NAME
ACITY Outlet Center, Turkey
PROJECT REQUIREMENTS
All energy requirements of ACITY Outlet Center, which was built on a 50.000 square meters area, have been met.
SOLUTION WE DELIVERED
The natural gas trigeneration system, whose total power is 2 MW, has been meeting nearly 95% of the electrical and thermal energy demands of ACITY Shopping Mall in the winter months and approximately 90% of its power and cooling needs in the summer months for a period of more than 2 years.